Build · Sod installation
Sod installation
A finished lawn in a day — graded, laid, and rolled.
Typical range $2k–$15k
Designed and managed by GreenWay, installed by our vetted, licensed crews. Portfolio work is credited to its crew; we don’t pass off other people’s patios as our own.
Sod installation — wide, architectural, low angle at dusk
What’s included
- Old turf removal and grading
- Soil prep and starter fertilizer
- Fresh sod, cut and fit
- Rolling and seam finishing
- Watering schedule to establish
Materials & options
Real choices, with the trade-offs stated plainly.
Tall fescueBest all-round for Northland sun and shade mix.
ZoysiaDense, heat-tolerant, slower to establish.
How it goes
- 01
Walk
We measure and check grade and drainage.
- 02
Prep
Strip, grade, and amend the soil.
- 03
Lay
Sod cut, fit, and rolled the same day.
- 04
Water
A clear schedule to root it in.
- 05
Keep
Roll it into the level-pay fertilization program.
Before & after
After
Before
Questions
- Before / after
- Sod is one of our mandatory before/after comparisons — bare grade to finished lawn in a day.