GWGREENWAYEXTERIORS

Build · Sod installation

Sod installation

A finished lawn in a day — graded, laid, and rolled.

Typical range $2k–$15k

Designed and managed by GreenWay, installed by our vetted, licensed crews. Portfolio work is credited to its crew; we don’t pass off other people’s patios as our own.

What’s included

  • Old turf removal and grading
  • Soil prep and starter fertilizer
  • Fresh sod, cut and fit
  • Rolling and seam finishing
  • Watering schedule to establish

Materials & options

Real choices, with the trade-offs stated plainly.

Tall fescueBest all-round for Northland sun and shade mix.
ZoysiaDense, heat-tolerant, slower to establish.

How it goes

  1. 01

    Walk

    We measure and check grade and drainage.

  2. 02

    Prep

    Strip, grade, and amend the soil.

  3. 03

    Lay

    Sod cut, fit, and rolled the same day.

  4. 04

    Water

    A clear schedule to root it in.

  5. 05

    Keep

    Roll it into the level-pay fertilization program.

Before & after

After
Before
Drag to compare. Real project media replaces these plates on license.

Questions

Before / after
Sod is one of our mandatory before/after comparisons — bare grade to finished lawn in a day.
CallText